HDPE 블록 마이크로덕트 커넥터 압력 테스트: 설치자를 위한 간단한 체크리스트
When a commissioning technician in Bristol pressurized a new microduct section, the gauge fell rapidly and the team blamed the gas-block fitting. Replacing it changed nothing. A review found that the seal had been tightened before cable blowing and the jacket carried a shallow groove at the sealing point: the failed test exposed a process error rather than an unexplained product defect. Summary: Pressure-test…
