{"id":3867,"date":"2026-02-20T10:00:00","date_gmt":"2026-02-20T10:00:00","guid":{"rendered":"https:\/\/microductconnector.com\/blog\/role-of-microduct-fittings-in-fiber-optic-installations\/"},"modified":"2026-10-23T09:43:05","modified_gmt":"2026-10-23T09:43:05","slug":"role-of-microduct-fittings-in-fiber-optic-installations","status":"publish","type":"post","link":"https:\/\/microductconnector.com\/tr\/blog\/role-of-microduct-fittings-in-fiber-optic-installations\/","title":{"rendered":"Fiber Optik Kurulumlar\u0131nda Mikro Kanal Ek Par\u00e7alar\u0131: Rolleri, T\u00fcrleri ve Se\u00e7imi"},"content":{"rendered":"<article>\n<p>Oulu\u2019daki bir a\u011f kurulum uzman\u0131 iki tanesini birle\u015ftirdi\u011finde <strong class=\"blog-core-keyword\">mikrokanal<\/strong> Fiber \u00fcfleme i\u015fleminden \u00f6nceki b\u00f6l\u00fcmlerde, nominal kanal etiketine g\u00f6re bir konekt\u00f6r se\u00e7ti ve kompres\u00f6r\u00fc \u00e7al\u0131\u015ft\u0131rd\u0131. Bas\u0131n\u00e7 istikrara kavu\u015fmad\u0131 ve kablo birka\u00e7 dakika i\u00e7inde durdu. Bu ba\u011flant\u0131 eleman\u0131n\u0131n otomatik olarak hatal\u0131 oldu\u011fu s\u00f6ylenemezdi: g\u00fczerg\u00e2hta farkl\u0131 d\u0131\u015f \u00e7apl\u0131 kanallar bulunuyor ve kablonun kesim ucu yeterince haz\u0131rlanmam\u0131\u015ft\u0131. Ekip, boyutlar\u0131, oturma derinli\u011fini ve planlanan test prosed\u00fcr\u00fcn\u00fc kontrol ettikten sonra, montaj i\u015flemine devam edilebilirdi.<\/p>\n<p>H\u0131zl\u0131 cevap: <strong>Mikrokanal ba\u011flant\u0131 elemanlar\u0131<\/strong> hava \u00fcflemeli bir tane yap\u0131n <strong class=\"blog-core-keyword\">fiber rotas\u0131<\/strong> S\u00fcrekli, kullan\u0131\u015fl\u0131 ve bir b\u00fct\u00fcn olarak test edilebilir. Belirleyici ayr\u0131m, bir ba\u011flant\u0131 par\u00e7as\u0131n\u0131n d\u0131\u015f \u00e7ap aray\u00fcz\u00fc ile bir kablonun ge\u00e7i\u015fini belirleyen kanal\u0131n i\u00e7 \u00e7ap\u0131 aras\u0131ndad\u0131r. IEC 60794-5-20, \u00fcfleme i\u00e7in tasarlanm\u0131\u015f mikrokanal kablaman\u0131n gerekliliklerini ele al\u0131r, ancak her konekt\u00f6r i\u00e7in kapsaml\u0131 bir sertifikasyon de\u011fildir. Sat\u0131n almadan \u00f6nce hem kanal boyutlar\u0131n\u0131, hem ba\u011flant\u0131 par\u00e7as\u0131n\u0131n i\u015flevini, hem de kullan\u0131m ortam\u0131n\u0131 ve proje test ko\u015fullar\u0131n\u0131 belirtin; ard\u0131ndan fiber \u00fcflemeden \u00f6nce her tamamlanm\u0131\u015f ba\u011flant\u0131y\u0131 inceleyip test edin.<\/p><p class=\"article-internal-link\">\u0130lgili okumalar: <a href=\"https:\/\/microductconnector.com\/blog\/best-end-stop-connectors-essential-guide-for-installations\/\">son durdurma kurulum k\u0131lavuzu<\/a>.<\/p>\n<h2>K\u00f6t\u00fc bir mikrokanal ba\u011flant\u0131 par\u00e7as\u0131n\u0131n fiber \u00fcfleme i\u015flemine verdi\u011fi zarar<\/h2>\n<p>Bir mikrokanal sistemi, sadece kanal ve kablodan ibaret de\u011fildir. D\u00fcz ba\u011flant\u0131lar hatt\u0131 uzat\u0131r; red\u00fcksiyon par\u00e7alar\u0131 tasarlanan boyut de\u011fi\u015fimlerini k\u00f6pr\u00fcler; yuva ba\u011flant\u0131 elemanlar\u0131 da\u011f\u0131t\u0131mlar\u0131 d\u00fczenler; u\u00e7 kapaklar\u0131 ve t\u0131pa par\u00e7alar\u0131 kullan\u0131lmayan yollar\u0131 korur; ayr\u0131ca a\u011f tasar\u0131m\u0131nda b\u00f6l\u00fcmler aras\u0131nda ayr\u0131m gerekti\u011fi durumlarda gaz bloke edici bile\u015fenler belirtilebilir. Her bir ba\u011flant\u0131 eleman\u0131 hatt\u0131n geometrisini de\u011fi\u015ftirir ve montaj s\u0131ras\u0131nda kullan\u0131lan havan\u0131n ne kadar iyi tutulaca\u011f\u0131 ile kablonun ne kadar sorunsuz ge\u00e7i\u015f yapaca\u011f\u0131 \u00fczerinde etkili olabilir.<\/p>\n\n<figure class=\"wp-block-image size-full\" style=\"width:50%;max-width:600px;margin:1.5rem auto\"><img width=\"600\" height=\"800\" alt=\"Microduct coupler in a fiber network handhole product detail and installation context\" class=\"wp-image-4642\" decoding=\"async\" loading=\"lazy\" src=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline1-600x800-1.webp\" style=\"width:100%;height:auto;display:block\" srcset=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline1-600x800-1.webp 600w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline1-600x800-1-225x300.webp 225w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline1-600x800-1-9x12.webp 9w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n<p>Bu durum, uygun se\u00e7imi toplam maliyet a\u00e7\u0131s\u0131ndan de\u011ferlendirmeyi gerektirir. D\u00fc\u015f\u00fck birim fiyat\u0131, \u00fcfleme i\u015fleminin durmas\u0131, kablonun yeniden kurtar\u0131lmas\u0131 veya ka\u00e7\u0131r\u0131lan in\u015faat zaman penceresi gibi fakt\u00f6rler nedeniyle telafi edilemeyebilir. Belgelenmi\u015f bir ba\u011flant\u0131n\u0131n maliyetini, hatt\u0131n trafi\u011fe kapat\u0131lmas\u0131ndan sonra belirsiz bir ba\u011flant\u0131n\u0131n te\u015fhis edilmesinin maliyetiyle kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/p>\n<table><thead><tr><th>Ba\u011flant\u0131 tipi<\/th><th>Birincil rol<\/th><th>Kilit tedarik kontrol\u00fc<\/th><th>Y\u00f6nlendirme riski y\u00f6netimi<\/th><\/tr><\/thead><tbody><tr><td>D\u00fcz ba\u011flant\u0131 eleman\u0131<\/td><td>Ayn\u0131 boyuttaki kanal b\u00f6l\u00fcmlerini hizal\u0131 olarak birle\u015ftirir.<\/td><td>Her iki u\u00e7taki kesin kanal d\u0131\u015f \u00e7ap\u0131 ve takma derinli\u011fi<\/td><td>Hizalama eksikli\u011fi veya hasarl\u0131 kanal ucu<\/td><\/tr>\n<tr><td>Red\u00fckt\u00f6r ba\u011flant\u0131s\u0131<\/td><td>Belirtilen iki kanal d\u0131\u015f \u00e7ap\u0131n\u0131 birbirine ba\u011flar<\/td><td>Her ucun boyutu ve a\u015fa\u011f\u0131 ak\u0131m kablo rotas\u0131<\/td><td>\u0130stenmeyen bir k\u0131s\u0131tlama veya yanl\u0131\u015f y\u00f6nland\u0131rma<\/td><\/tr>\n<tr><td>\u015eube veya \u00e7ok yollu ba\u011flant\u0131 par\u00e7as\u0131<\/td><td>Planlanm\u0131\u015f bir da\u011f\u0131t\u0131m yolunu olu\u015fturur<\/td><td>Gelecekteki \u00e7al\u0131\u015fmalar i\u00e7in ba\u011flant\u0131 noktas\u0131 tan\u0131mlamas\u0131 ve eri\u015fimi<\/td><td>Canl\u0131 ve yedek rotalar\u0131n kar\u0131\u015ft\u0131r\u0131lmas\u0131<\/td><\/tr>\n<tr><td>Gaz blok, t\u0131ka\u00e7 veya u\u00e7 kapa\u011f\u0131<\/td><td>Belirtilen rotay\u0131 kapat\u0131r veya izole eder.<\/td><td>\u0130\u015flev, kanal boyutu ve montaj konumu<\/td><td>Ge\u00e7i\u015f gerektiren yerde bir kapanma kullanmak<\/td><\/tr><\/tbody><\/table>\n<h2>Hangi ba\u011flant\u0131 par\u00e7as\u0131na ihtiyac\u0131n\u0131z var: d\u00fcz, red\u00fckt\u00f6r, u\u00e7 kapa\u011f\u0131 m\u0131 yoksa gaz blo\u011fu mu?<\/h2>\n<p>\u0130lk olarak rotan\u0131n \u00e7izimine ba\u015flay\u0131n. Mikrokanal ba\u011flant\u0131 eleman\u0131 kategorisi, \u015fekilleri kar\u015f\u0131la\u015ft\u0131rmak i\u00e7in faydal\u0131d\u0131r; ancak sipari\u015f sat\u0131r\u0131nda her ba\u011flant\u0131 noktas\u0131ndaki ger\u00e7ek kanal d\u0131\u015f \u00e7ap\u0131 belirtilmelidir. D\u00fcz bir ba\u011flant\u0131 eleman\u0131 yaln\u0131zca her iki kanal ucunun da belirtilen aray\u00fczlerle e\u015fle\u015fti\u011fi durumlarda uygundur. Kesimin d\u00fcz, temiz ve tamamen yerle\u015ftirildi\u011fi durumlarda, d\u00fcz bir mikrokanal ba\u011flant\u0131 eleman\u0131 ayn\u0131 boyuttaki rotay\u0131 basit tutabilir.<\/p>\n<p>Red\u00fckt\u00f6rler, kablo ve hava ak\u0131m\u0131n\u0131n de\u011fi\u015fen geometriyle uyum sa\u011flamas\u0131 gerekti\u011finden ekstra \u00f6zen gerektirir. Belirlenen k\u00fc\u00e7\u00fck ve b\u00fcy\u00fck u\u00e7lar\u0131, kablo \u00fcreticisinin yol g\u00f6sterimini ve bu de\u011fi\u015fikli\u011fin m\u00fchendislikle tasarlanm\u0131\u015f yolu olu\u015fturan bir par\u00e7as\u0131 olup olmad\u0131\u011f\u0131n\u0131 do\u011frulay\u0131n. Tasarlanm\u0131\u015f bir ge\u00e7i\u015f i\u00e7in, mevcut mikrokanal red\u00fckt\u00f6r ba\u011flant\u0131 konfig\u00fcrasyonunu i\u015faretli kanal boyutlar\u0131yla kar\u015f\u0131la\u015ft\u0131r\u0131n; neredeyse e\u015fle\u015fen metrik ve in\u00e7 \u00f6l\u00e7\u00fcleri asla birbirinin yerine kullan\u0131lmaz kabul etmeyin.<\/p>\n<table><thead><tr><th>Se\u00e7im alan\u0131<\/th><th>Ne kaydedilecek<\/th><th>Neden \u00f6nemli oldu\u011fu<\/th><\/tr><\/thead><tbody><tr><td>Kanal aray\u00fcz\u00fc<\/td><td>\u00dcretici, nominal boyut, \u00f6l\u00e7\u00fclen d\u0131\u015f \u00e7ap ve duvar\/\u0130\u00c7 \u00e7ap<\/td><td>OD, uygunluk uyumunu belirler; ID, kablonun ge\u00e7i\u015fini etkiler.<\/td><\/tr>\n<tr><td>Uyarlama i\u015flevi<\/td><td>D\u00fcz boru, red\u00fckt\u00f6r, yaka, kapatma veya gaz blo\u011fu<\/td><td>Yol i\u015flevinin yanl\u0131\u015f bile\u015fenle \u00e7\u00f6z\u00fclmesini \u00f6nler.<\/td><\/tr>\n<tr><td>Kurulum ayar\u0131<\/td><td>Do\u011frudan g\u00f6m\u00fcl\u00fc, odac\u0131k, bina giri\u015f veya i\u00e7 mekan hatt\u0131<\/td><td>K\u0131lavuzlar, eri\u015fim, koruma ve projeye \u00f6zel gereksinimleri belirler.<\/td><\/tr>\n<tr><td>Kabul plan\u0131<\/td><td>G\u00f6rsel incelemeler, test bas\u0131nc\u0131, s\u00fcre ve ge\u00e7me\/ba\u015far\u0131s\u0131zl\u0131k kural\u0131<\/td><td>Site testlerini \u00f6znelerden ziyade tekrarlanabilir hale getirir.<\/td><\/tr><\/tbody><\/table>\n<h2>How to prepare and test a microduct joint<\/h2>\n<p>Prepare every duct end according to the fitting manufacturer&#8217;s instructions: cut squarely, remove debris, preserve the tube profile, and push it to the positive stop where applicable. A visible insertion mark can support inspection but does not replace a pull check or approved test procedure. Do not use unapproved lubricants, adhesives, or improvised sealing methods.<\/p>\n\n<figure class=\"wp-block-image size-full\" style=\"width:50%;max-width:600px;margin:1.5rem auto\"><img width=\"600\" height=\"800\" alt=\"Microduct coupler in a fiber network handhole product inspection and service context\" class=\"wp-image-4643\" decoding=\"async\" loading=\"lazy\" src=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline2-600x800-1.webp\" style=\"width:100%;height:auto;display:block\" srcset=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline2-600x800-1.webp 600w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline2-600x800-1-225x300.webp 225w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/oct14-3867-inline2-600x800-1-9x12.webp 9w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n<p>Before fiber blowing, isolate the section and use the project&#8217;s defined pressure-decay test or other documented air-tightness test. Record the section, test medium, stabilized pressure, duration, instrument, ambient conditions where relevant, and acceptance result. A pressure-decay test is a test method, not a universal product rating: the pressure and duration must come from the network specification and the applicable component documentation. Investigate a failed section systematically-duct end, seating, component damage, and test setup-rather than simply increasing pressure.<\/p>\n<p>Standards support disciplined specifications, but their scope matters. IEC 60794-5-20 concerns microduct cabling designed for installation by blowing; IEC 60794-1-2 provides optical-fiber-cable test procedures; and ITU-T L.35 gives guidance on installing optical-fiber cable networks. These sources do not justify claiming that an individual fitting is certified, leak-proof, or suitable for every duty. Contract documents, destination-market requirements, and model-specific manufacturer data remain the basis for procurement and marketing claims.<\/p>\n<h2>What to confirm before ordering<\/h2>\n<ol>\n<li>Map every joint to a route location and identify whether it must pass cable, change size, branch, or terminate a spare duct.<\/li>\n<li>Capture duct OD and ID from current manufacturer documentation; measure unmarked legacy duct rather than guessing from appearance.<\/li>\n<li>Request the exact fitting data, installation instructions, and compatibility information for the planned duct combination.<\/li>\n<li>Define the test record before crews arrive, including the test method and the person authorized to accept the section.<\/li>\n<\/ol>\n<p>Oulu can be included early in a specification-led review of microduct gas-block options and related fitting configurations. The useful supplier conversation starts with duct dimensions, route purpose, installation conditions, and documentation needs-not a generic request for a connector.<\/p>\n<h2>Use one fitting function for each route problem<\/h2>\n<p>A route becomes easier to design when each fitting has one defined job. A straight connector joins equal-size ducts; a reducer handles a documented OD transition; an end stop closes an unused duct; and a gas-block design is selected when the project requires a tested air or water barrier. These names are not interchangeable. The duct outside diameter, bore continuity, pressure class and access condition should be written beside the fitting function on the schedule.<\/p><p class=\"article-internal-link\">\u0130lgili okumalar: <a href=\"https:\/\/microductconnector.com\/blog\/what-microduct-connectors-are-commonly-used-in-the-abfsystem\/\">mikrokanal konekt\u00f6r\u00fc se\u00e7im k\u0131lavuzu<\/a>.<\/p>\n<table><thead><tr><th>Route situation<\/th><th>Starting fitting choice<\/th><th>Kabul sorusu<\/th><\/tr><\/thead><tbody><tr><td>Same-size duct extension<\/td><td>D\u00fcz ba\u011flant\u0131 eleman\u0131<\/td><td>Is the bore continuous and the seal seated?<\/td><\/tr><tr><td>Documented size transition<\/td><td>\u0130ndirgeyici<\/td><td>Does the drawing control the transition and both OD ranges?<\/td><\/tr><tr><td>Unused or staged duct<\/td><td>Son durdurucu veya u\u00e7 kapak<\/td><td>Can it be removed without damaging the duct?<\/td><\/tr><tr><td>Building entry or zone boundary<\/td><td>Belirtilen durumlarda gaz blo\u011fu ba\u011flant\u0131 par\u00e7as\u0131<\/td><td>What barrier test and pressure hold does the project require?<\/td><\/tr><\/tbody><\/table>\n<p>For field preparation, link this decision to the <a href=\"https:\/\/microductconnector.com\/blog\/top-fiber-optic-end-stops-for-sourcing\/\">end-stop sourcing guide<\/a> ve <a href=\"https:\/\/microductconnector.com\/products\/\">mikrokanal konekt\u00f6r\u00fc serisi<\/a>. Standards such as IEC 60794-5 and EN\/IEC product documents define scope and methods; they do not remove the need to follow the network owner&#8217;s acceptance plan.<\/p><h2>What evidence should be complete before fiber enters a microduct?<\/h2><p>Use a staged handover. First confirm the route drawing, duct identity, outside diameter and every joint or transition. Then check the cut, insertion, support, cleanliness and end protection. Finally run the project-approved continuity, proving or integrity check and record the equipment, medium, stabilization, criterion and result. ITU-T L.35 and L.87 provide optical-cable and outside-plant context, while IEC 60794-5-20 identifies a microduct-cabling scope; none replaces a route-specific acceptance method.<\/p><p>A passing pressure result does not prove that a bend, bore restriction or feed arrangement will accept the chosen fiber unit. If a blowing run stops, preserve the condition and isolate the nearest transition before replacing a connector. Compare the cable, duct and connector dimensions, then inspect bends and machine settings. This sequence produces evidence that distinguishes a joint problem from a route problem.<\/p><table><thead><tr><th>Handover stage<\/th><th>Kay\u0131t<\/th><th>Karar<\/th><\/tr><\/thead><tbody><tr><td>Before jointing<\/td><td>OD, wall, cut quality, route ID<\/td><td>Reject damaged or mismatched ends<\/td><\/tr><tr><td>Birle\u015ftirmeden sonra<\/td><td>Part, insertion, alignment and support<\/td><td>Accept only the documented assembly<\/td><\/tr><tr><td>\u00dcflemeden \u00f6nce<\/td><td>Continuity, obstruction, leakage and test result<\/td><td>Release the route or correct the boundary<\/td><\/tr><\/tbody><\/table><h2>S\u0131k\u00e7a sorulan sorular<\/h2>\n<h3>What fittings are used in microduct systems?<\/h3>\n<p>Common microduct-system fittings include straight connectors, reducers, branch fittings, end caps, plugs, and gas-blocking components. The required type depends on whether the route must continue, change duct size, distribute, or close a section; select by the documented network design and duct interfaces.<\/p>\n<h3>Why are microduct fittings important for fiber blowing?<\/h3>\n<p>Fittings join the duct path that carries installation air and guides the cable, so poor sizing or assembly can interrupt the planned blowing run. Their importance is practical: a properly specified and tested joint helps the team identify route issues before cable installation.<\/p>\n<h3>How do I choose a microduct connector size?<\/h3>\n<p>Match each connector port to the actual outside diameter of the duct it receives, then confirm the duct inside diameter supports the intended cable route. Use manufacturer data and measurements for existing duct; nominal labels alone may be incomplete or from different sizing systems.<\/p>\n<h3>Can microduct fittings be reused?<\/h3>\n<p>Reuse depends on the exact fitting design, its condition, and the manufacturer&#8217;s instructions. Inspect the body, retention elements, seals, and removed duct end; if damage, contamination, or uncertain retention is present, replace the component rather than relying on a reused joint.<\/p>\n<h3>How do I test a microduct connection for leaks?<\/h3>\n<p>Isolate the route section and perform the pressure-decay or other air-tightness test defined in the project specification. Log the setup and result, then correct the duct end, seating, component, or test arrangement indicated by the investigation before accepting the section.<\/p>\n<h3>What is the difference between a straight connector and a reducer?<\/h3>\n<p>A straight connector joins two duct ends with the same specified outside diameter. A reducer joins two different specified duct sizes, so its orientation and effect on the downstream cable path need to be checked during design and installation.<\/p><p class=\"article-internal-link\">\u0130lgili okumalar: <a href=\"https:\/\/microductconnector.com\/about-us\/\">Oulu Connector company information<\/a>.<\/p>\n<h2>Kaynak\u00e7a<\/h2><ol class=\"article-references\"><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/3509\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60794-5-20 \u2013 mikrokanal kablolama kapsam\u0131<\/a>.<\/li><li><a href=\"https:\/\/www.itu.int\/rec\/T-REC-L.35\" rel=\"nofollow noopener\" target=\"_blank\">ITU-T L.35 &#8211; optical fibre cable installation context<\/a>.<\/li><li><a href=\"https:\/\/www.itu.int\/rec\/T-REC-L.87\/en\" rel=\"nofollow noopener\" target=\"_blank\">ITU-T L.87 &#8211; optical fibre cable maintenance context<\/a>.<\/li><li><a href=\"https:\/\/www.hexatronic.com\/en\/instructions-and-guides\/hexatronic-duct-integrity-test-kits\" rel=\"nofollow noopener\" target=\"_blank\">Hexatronic duct-integrity testing guidance<\/a>.<\/li><\/ol>\n<p class=\"blog-related-products\">Related products: Microduct connectors | <a href=\"https:\/\/microductconnector.com\/hdpe-microducts\/\">HDPE mikrokanal<\/a> | <a href=\"https:\/\/microductconnector.com\/blowing-machines\/\">Kablo \u00fcfleme makineleri<\/a><\/p><h2>\u00d6zet<\/h2><p>Microduct fittings protect a fiber route only when their function, dimensions and test method agree. Start with the route stage, measure the duct and match the connector, reducer, end stop or <strong>gaz blo\u011fu<\/strong> to that state. Qualify the passage before introducing fiber and keep the test record with the route drawing. A pressure result alone does not prove bend suitability or cable-blowing success; investigate the nearest transition alongside geometry, obstruction and machine conditions. ITU and IEC documents frame the application, while the project procedure and product drawing define acceptance. Oulu&#8217;s microduct fitting range can be reviewed against the measured route and handover requirements.<\/p><\/article>","protected":false},"excerpt":{"rendered":"<p>Fiber optik kablolama uygulamalar\u0131nda mikrokanal ba\u011flant\u0131 elemanlar\u0131n\u0131n rollerini anlay\u0131n: d\u00fcz ba\u011flant\u0131 par\u00e7alar\u0131, daralt\u0131c\u0131lar, u\u00e7 durdurucular ve gaz bloklar\u0131; bunlar\u0131n boyutland\u0131r\u0131lmas\u0131, test edilmesi ve kabul kontrolleri.<\/p>","protected":false},"author":2,"featured_media":5300,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-3867","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-insights"],"_links":{"self":[{"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/posts\/3867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/comments?post=3867"}],"version-history":[{"count":10,"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/posts\/3867\/revisions"}],"predecessor-version":[{"id":4861,"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/posts\/3867\/revisions\/4861"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/media\/5300"}],"wp:attachment":[{"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/media?parent=3867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/categories?post=3867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microductconnector.com\/tr\/wp-json\/wp\/v2\/tags?post=3867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}