{"id":4098,"date":"2026-04-21T10:00:00","date_gmt":"2026-04-21T10:00:00","guid":{"rendered":"https:\/\/microductconnector.com\/blog\/how-to-choose-the-right-connector\/"},"modified":"2026-10-23T09:42:31","modified_gmt":"2026-10-23T09:42:31","slug":"how-to-choose-the-right-connector","status":"publish","type":"post","link":"https:\/\/microductconnector.com\/it\/blog\/how-to-choose-the-right-connector\/","title":{"rendered":"Come scegliere il connettore per microcondotti pi\u00f9 adatto"},"content":{"rendered":"<article>\n<p>Quando un supervisore di cantiere del settore delle telecomunicazioni, durante un\u2019attivit\u00e0 dimostrativa a Rotterdam, ha tagliato l\u2019estremit\u00e0 di un condotto in modo perfettamente ortogonale e ha montato un nuovo raccordo, il difetto \u00e8 apparso immediatamente: il giunto non si \u00e8 innestato correttamente e la tenuta all\u2019aria risultava compromessa. Un esame della scheda di lavoro ha messo in discussione la prima ipotesi: il raccordo non era necessariamente difettoso; la dimensione selezionata non corrispondeva al diametro misurato del condotto, e la procedura di installazione non aveva specificato adeguatamente le modalit\u00e0 di sigillatura e di sostegno. Questo \u00e8 il problema pratico che si cela dietro\u2026 <em>come scegliere un\/a <strong>connettore per microdotti<\/strong><\/em>Selezione, dimensionamento, ambiente e processo devono essere coerenti prima che il pezzo raggiunga la trincea.<\/p>\n<p> Scegliere un connettore per microcondotti tenendo conto delle dimensioni misurate del condotto, del tipo di giunzione richiesto, dell\u2019ambiente lungo il tracciato, della funzione di tenuta e dell\u2019accessibilit\u00e0 necessaria per la manutenzione. La norma IEC 60794-5:2020 si riferisce ai microcondotti per esterno, mentre la ISO 9001:2015 riguarda il sistema di gestione della qualit\u00e0 del produttore; tuttavia, nessuna di queste norme, presa singolarmente, costituisce una prova che un determinato connettore sia certificato per ogni tipo di tracciato. Si raccomanda di registrare le dimensioni effettive e la struttura del condotto, di selezionare una famiglia di connettori documentata e di verificare l\u2019adeguato posizionamento e la tenuta durante l\u2019installazione prima di approvare il tracciato.<\/p>\n<h2>Cosa deve corrispondere prima che un connettore venga selezionato?<\/h2>\n<p>Un raccordo \u00e8 un\u2019interfaccia dimensionale e funzionale, non semplicemente una boccola che unisce due estremit\u00e0 di tubo. Iniziate identificando il materiale del microcondotto e misurando il diametro esterno effettivo e le relative informazioni sullo spessore della parete o sul diametro interno nel punto di giunzione. Confrontate tali misurazioni con i dati tecnici forniti dal produttore; non sceglietelo basandovi esclusivamente su una denominazione nominale riportata da un vecchio disegno, poich\u00e9 il condotto installato potrebbe appartenere a un lotto o a una configurazione diversi.<\/p>\n<figure class=\"wp-block-image size-full\" style=\"width:50%;max-width:600px;margin:1.5rem auto\"><img alt=\"Inspection of the visible interfaces on Microduct Gas-block Connector\" class=\"wp-image-5039\" decoding=\"async\" height=\"800\" loading=\"lazy\" src=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline1.webp\" style=\"width:100%;height:auto;display:block\" width=\"600\" srcset=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline1.webp 600w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline1-225x300.webp 225w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline1-9x12.webp 9w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n<p>In seguito, definire le funzioni del raccordo. Un raccordo dritto mantiene lo stesso percorso della condotta; un raccordo riduttore collega sezioni di dimensioni diverse solo quando tale transizione \u00e8 prevista dal progetto. Un tappo di chiusura o un componente di terminazione assolve a una funzione diversa rispetto a un raccordo passante, poich\u00e9 chiude e protegge un\u2019estremit\u00e0 aperta. La scelta deve inoltre specificare se il collegamento \u00e8 temporaneo durante la fase di costruzione oppure se \u00e8 destinato a rimanere installato per tutta la durata di servizio dell\u2019impianto.<\/p>\n<ul>\n<li>Dimensioni: Registrare le dimensioni misurate del condotto e confrontarle con il range specificato del connettore.<\/li>\n<li>Geometria: Verificare se il percorso richiede un giunto dritto, una riduzione progettata, una derivazione o una chiusura terminale.<\/li>\n<li>Ambiente: Individuare nelle specifiche di progetto le condizioni di installazione sotterranea, in pozzetto di accesso, all\u2019aperto, umida o interrata diretta.<\/li>\n<li>Funzione di tenuta: Indicare se il raccordo deve mantenere un percorso dell\u2019aria, impedire l\u2019ingresso di umidit\u00e0, proteggere un condotto di riserva o soddisfare un\u2019altra specifica requisito documentato.<\/li>\n<li>Accesso: Lasciare spazio sufficiente per ispezionare, riparare, etichettare o sostituire il giunto senza danneggiare i condotti adiacenti.<\/li>\n<\/ul>\n<h2>In che modo la geometria del connettore e l\u2019ambiente di routing influiscono sulla decisione?<\/h2>\n<p>La stessa dimensione nominale della condotta pu\u00f2 richiedere decisioni diverse a seconda delle variazioni nella geometria del percorso o nell\u2019ambiente. Un tratto rettilineo pu\u00f2 necessitare di un raccordo passante compatto, mentre una transizione tra dimensioni di condotte richiede un componente riduttore documentato e una chiara direzione di montaggio. Un raccordo installato in una fossa di ispezione pu\u00f2 essere facilmente controllabile, ma una giunzione interrata richiede che il team di progetto verifichi che i componenti selezionati e il metodo di protezione siano adeguati all\u2019interramento. L\u2019aspetto esteriore non costituisce prova dell\u2019idoneit\u00e0 all\u2019interramento diretto.<\/p>\n<p>Considera l\u2019intero sistema in HDPE piuttosto che il singolo giunto. <a href=\"https:\/\/microductconnector.com\/hdpe-microducts\/\">microdotto in HDPE<\/a> Questa guida pu\u00f2 aiutare gli installatori a definire il rapporto tra la realizzazione delle canalizzazioni e l\u2019installazione delle fibre ottiche, ma le specifiche di progetto e la documentazione tecnica dei prodotti vigenti restano i documenti decisionali. Se un percorso comprende materiali di canalizzazione misti, spessori delle pareti non standard o una sezione da riparare, annota tale informazione e ottieni la conferma di compatibilit\u00e0 prima di ordinare un connettore.<\/p>\n<table>\n<caption>Foglio di lavoro per la selezione dei connettori per microcondotti<\/caption>\n<thead>\n<tr>\n<th>Punto decisionale<\/th>\n<th>Prove da registrare<\/th>\n<th>Conseguenza della selezione<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Dimensioni del condotto<\/td>\n<td>Diametro esterno misurato, informazioni sul foro o sullo spessore della parete, e qualsiasi variazione al giunto<\/td>\n<td>Scegli un raccordo il cui range documentato corrisponda al condotto installato.<\/td>\n<\/tr>\n<tr>\n<td>Geometria del giunto<\/td>\n<td>Tratto rettilineo, riduzione pianificata, derivazione, riparazione o terminazione<\/td>\n<td>Utilizzare il tipo di connettore specifico per quella connessione; non improvvisare adattatori.<\/td>\n<\/tr>\n<tr>\n<td>Ambiente di routing<\/td>\n<td>Condizione sotterranea, in pozzetto di accesso, a vista, umida o interrata diretta<\/td>\n<td>Confermare negli elaborati di progetto gli obblighi relativi alla sigillatura, alla protezione e all\u2019installazione.<\/td>\n<\/tr>\n<tr>\n<td>Resistenza ad aria e umidit\u00e0<\/td>\n<td>Percorso d\u2019aria obbligatorio, esclusione dell\u2019umidit\u00e0 o protezione del condotto di riserva<\/td>\n<td>Specifica la tenuta e la configurazione di protezione finale pertinenti.<\/td>\n<\/tr>\n<tr>\n<td>Accesso alla manutenzione<\/td>\n<td>Spazio di lavoro, posizione dell\u2019etichetta e percorso per future ispezioni o sostituzioni<\/td>\n<td>Consente di ispezionare o rifare il giunto senza sollecitare il condotto.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Quale procedura di installazione previene perdite e disallineamenti?<\/h2>\n<p>Una corretta scelta del raccordo pu\u00f2 comunque fallire se l\u2019estremit\u00e0 del condotto non \u00e8 preparata adeguatamente. Tagliare il condotto in modo perfettamente ortogonale con l\u2019utensile approvato, rimuovere detriti e sbavature e verificare che l\u2019estremit\u00e0 non sia ovalizzata o danneggiata. Allineare i due condotti prima dell\u2019inserimento, quindi spingerli completamente nel raccordo seguendo le istruzioni del fornitore. Non torcere, piegare n\u00e9 forzare il montaggio per compensare una dimensione errata o un percorso ostruito.<\/p>\n<figure class=\"wp-block-image size-full\" style=\"width:50%;max-width:600px;margin:1.5rem auto\"><img alt=\"Visible surface and connection-end preparation detail for straight direct bury micro duct connector\" class=\"wp-image-5040\" decoding=\"async\" height=\"800\" loading=\"lazy\" src=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline2.webp\" style=\"width:100%;height:auto;display:block\" width=\"600\" srcset=\"https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline2.webp 600w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline2-225x300.webp 225w, https:\/\/microductconnector.com\/wp-content\/uploads\/2026\/10\/repair59-4098-inline2-9x12.webp 9w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n<p>After assembly, inspect the seating and support. A transparent connector can make the insertion position visible, but visual confirmation is only one part of acceptance. The joint must also be protected from side loads, sharp bend transitions and accidental movement during backfill or later cable work. Keep the end clean until the connection is made, and fit the specified plug or cap whenever a duct is left open.<\/p>\n<p>The site\u2019s production procedure article provides manufacturing context, but it should not replace the installation method statement. The field record should identify the duct, connector type, installer, date, location and any corrective action. That record lets a maintenance team distinguish a sizing issue from a later route disturbance.<\/p>\n<h2>How can a buyer verify sealing and maintenance access?<\/h2>\n<p>The honest answer is that a connector is airtight only when the duct dimensions, clean cuts, seal components and insertion depth all match the specified assembly. A visual check can reveal incomplete seating or a displaced seal, but it does not prove leak-tightness on its own. Use the project\u2019s approved pressure, leak or continuity check where one is required, and record the method and result rather than copying a pass value from an unrelated route.<\/p>\n<p>Maintenance access is part of the same decision. A joint hidden behind a tight bend or unsupported at an access point can be difficult to inspect even if it initially holds air. Leave a clear label and service path, protect the connector from movement, and document any transition that future crews may mistake for a standard straight joint.<\/p>\n<table>\n<caption>Acceptance record for a microduct connector joint<\/caption>\n<thead>\n<tr>\n<th>Acceptance item<\/th>\n<th>What the installer checks<\/th>\n<th>What the handover record should show<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Identity and location<\/td>\n<td>Correct duct route, joint position and connector type<\/td>\n<td>Route mark-up, label and component reference<\/td>\n<\/tr>\n<tr>\n<td>End preparation<\/td>\n<td>Square, clean, undamaged cuts and compatible duct ends<\/td>\n<td>Inspection sign-off or installation photograph<\/td>\n<\/tr>\n<tr>\n<td>Seating and support<\/td>\n<td>Full insertion, visible alignment and no avoidable side load<\/td>\n<td>Installer check and any corrective-action note<\/td>\n<\/tr>\n<tr>\n<td>Seal or closure check<\/td>\n<td>Specified seals, plugs or caps installed for the route condition<\/td>\n<td>Component and environmental-duty record<\/td>\n<\/tr>\n<tr>\n<td>Project test<\/td>\n<td>Approved pressure, leak, continuity or other required check<\/td>\n<td>Test method, date, result and responsible person<\/td>\n<\/tr>\n<tr>\n<td>Future access<\/td>\n<td>Label, working space and protection retained after completion<\/td>\n<td>As-built drawing and maintenance note<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>When does a route need an end stop, gas block or protective cover?<\/h2>\n<p>Specify the function before choosing the accessory. An end stop closes an unused duct end against the conditions stated in its documentation. A joint connector joins duct sections. A gas-blocking arrangement addresses a different duty: limiting migration through an entry in the configuration for which it was designed. A <strong>protective cover<\/strong> can address mechanical exposure around a connection. Similar-looking parts should not be substituted across those functions without written evidence.<\/p>\n<p>The installation state matters. An empty duct and a duct containing a cable may require different sealing components. At a building entry, identify the duct OD, cable OD, wall or enclosure interface and applicable entry requirements. Ask which leakage path is controlled: the duct-to-fitting joint, the space around a cable, or the building penetration. A water-sealing claim for one interface does not establish <strong>blocco del gas<\/strong>ing, fire stopping or all building-entry duties.<\/p>\n<p>Hexatronic&#8217;s connector and end-stop data sheet separates straight, reducing and end-stop functions and describes an external cover for its direct-buried configuration. This is a manufacturer-specific example of why a cover and base connector may need to be specified together. It does not prove that any uncovered connector can be made suitable for burial with an arbitrary shell. Confirm the complete selected assembly and its installation instructions before procurement.<\/p>\n<h2>Which connector should be used for an air-blown fiber route?<\/h2>\n<p>For an air-blown fiber route, select a connector that preserves the intended duct path and sealing condition while presenting a clean, supported bore to the installation equipment. Check the cable-and-duct plan, the connector dimensions, the end preparation method and the access-point arrangement together. The air-blown fiber installation comparison is useful for framing the route decision, but it does not establish a universal connector, pressure or distance limit.<\/p>\n<p>Before blowing, verify continuity and remove or document obstructions. During the operation, stop if the cable behavior, air loss or connector movement differs from the approved method. Afterward, protect the cable end, inspect the joint and retain the optical and route records required by the contract. A connector that looks correct before blowing still needs post-installation acceptance.<\/p>\n<h2>Which standards should procurement teams cite?<\/h2>\n<p>Standards help define scope and verification; they should not be used as shorthand for unsupported product claims.<\/p>\n<ul>\n<li>IEC 60794-5:2020: Covers fibre-optic cable systems involving outdoor microducts. Use its scope alongside the project\u2019s duct, connector and installation requirements.<\/li>\n<li>EN 50411-2-8: Relates to fibre-management systems and protective housings. Confirm that the relevant component and intended use fall within the document\u2019s scope before citing it.<\/li>\n<li>ISO 9001:2015: Specifies quality-management-system requirements. It is not a product certification, a dimensional guarantee or proof that a connector suits a particular environment.<\/li>\n<\/ul>\n<p>Commercially, unsupported standards language can mislead a buyer and make acceptance harder. Ask for the current declaration, technical data and test evidence that apply to the exact component and destination market. If the project requires a regulatory or customer-specific approval, state that requirement in procurement rather than assuming a general standard covers it.<\/p>\n<h2>How should a reused connector be accepted or rejected?<\/h2>\n<p>Begin with the manufacturer&#8217;s stated <strong>politica di riutilizzo<\/strong> and the project&#8217;s requirements. A part that can be released mechanically is not automatically approved for repeated service after burial, impact or contamination. Inspect the body, release parts, sealing surfaces and duct ends using the permitted method. Replace a component when damage, uncertain retention or recurring leakage puts it outside the documented acceptance condition.<\/p>\n<p>Do not use tape, adhesive or an improvised sleeve to compensate for the wrong duct size or damaged interface. Such a repair can conceal the actual problem and change the assembly away from the tested configuration. If the product permits reconnection, prepare the duct ends as instructed and repeat the specified assembly and acceptance checks. Record that a reused component was involved so later inspection has an accurate history.<\/p>\n<p>For stock control, separate serviceable unused parts from recovered material awaiting inspection. Keep the component reference and lot where available, and match the replacement against the route&#8217;s current requirements rather than an old photograph alone. The <a href=\"https:\/\/microductconnector.com\/blog\/brief-introduction-of-the-production-procedure-of-the-micro-duct-connector\/\">connector production and batch-record guide<\/a> explains what supplier information can support this decision. For installation technique, the <a href=\"https:\/\/microductconnector.com\/blog\/hdpe-microduct-connectors-installation-7-steps-reliable-airtight-seal\/\">microduct connector installation guide<\/a> addresses preparation and seating; neither guide overrides the selected product&#8217;s reuse restrictions.<\/p>\n<h2>What should buyers do before ordering?<\/h2>\n<ol>\n<li>Measure the installed duct and attach the result to the purchase or technical query.<\/li>\n<li>Define the joint geometry, route environment, sealing duty and expected maintenance access.<\/li>\n<li>Request the connector drawing, installation instructions and compatibility statement for the selected duct.<\/li>\n<li>Agree the field inspection and any approved leak, pressure or continuity check before delivery.<\/li>\n<li>Require the handover records that will identify the joint and support future cable work.<\/li>\n<\/ol>\n<p>Oulu \/ ANMASPC presents microduct connectors, duct plugs, HDPE microducts and related pneumatic products for B2B sourcing. Review the current <a href=\"https:\/\/microductconnector.com\/products\/\">Gamma di connettori per microcondotti<\/a> against the project specification, then ask for route-specific documentation before committing to a size or connector type. Product availability, configuration and any certification claim should be confirmed in the current supplier documents.<\/p>\n<h2>Domande frequenti<\/h2>\n<h3>How do I measure a microduct before choosing a connector?<\/h3>\n<p>Identify the duct at the actual joint, make a clean inspection cut if permitted, and record the outside diameter plus the relevant bore or wall information. Compare the measured condition with the connector drawing and specified range. If the duct is ovalised, damaged or from a mixed batch, pause and obtain a compatibility decision instead of relying on the label alone.<\/p>\n<h3>What is the difference between a straight and reducing microduct connector?<\/h3>\n<p>A straight connector joins compatible duct ends on the same intended path and size. A reducing connector is designed for a planned transition between different duct sizes and should be selected from a documented size pairing. It is not a substitute for correcting a measurement error or forcing mismatched ducts together.<\/p>\n<h3>Do microduct connectors need to be rated for direct burial?<\/h3>\n<p>That depends on the route design and the connector, seal and protection arrangement specified for it. Direct-burial suitability should be confirmed in current product documentation and the project specification; it cannot be inferred from a connector\u2019s appearance or nominal size. Record the environmental duty before ordering.<\/p>\n<h3>How do I know whether a connector is airtight?<\/h3>\n<p>First verify the duct dimensions, clean square cuts, full insertion and correct seals. Then perform the project-approved pressure, leak or continuity check when required, because a visual seating check alone cannot establish airtightness. Keep the method and result with the joint record.<\/p>\n<h3>Can I reuse a push-fit microduct connector?<\/h3>\n<p>Reuse should be allowed only when the manufacturer\u2019s instructions and the project method permit it. Inspect the connector, seals and duct ends for damage, contamination or loss of retention, and replace any component outside the documented condition. A connector that has been removed from a stressed or buried joint needs particular scrutiny.<\/p>\n<h3>Which connector should I use for an air-blown fiber route?<\/h3>\n<p>Use the connector that matches the duct dimensions, route geometry, sealing duty and air-blown installation method documented for the project. Confirm that the joint is fully seated, supported and free of avoidable air leaks before blowing. The cable, duct, connector and equipment should be checked as one system rather than selected independently.<\/p>\n<h3>Can an end stop be used as a gas block around an installed cable?<\/h3>\n<p>Not unless its exact design is documented for that function and cable-and-duct combination. An empty-duct closure and a seal around a cable control different interfaces. Obtain the correct entry and sealing arrangement.<\/p>\n<h3>Does adding a cover make any connector suitable for direct burial?<\/h3>\n<p>No. Confirm a complete approved configuration, including the connector, cover and installation method. A cover from another design does not establish the required mechanical or environmental performance.<\/p>\n<h2>Riferimenti<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.hexatronic.com\/hubfs\/datasheets\/28701-MPB30601%2B_en-us_Hexatronic.pdf?1676475973812=\" rel=\"nofollow noopener\" target=\"_blank\">Hexatronic, Microduct Connectors and End Stops, 28701-MPB30601+, 2023: configuration and cover example<\/a><\/li>\n<li><a href=\"https:\/\/www.thefoa.org\/tech\/ref\/OSP\/install.html\" rel=\"nofollow noopener\" target=\"_blank\">Fiber Optic Association, Outside Plant Fiber Optic Cable Installation: pathway and cable-handling considerations<\/a><\/li>\n<\/ul>\n<h2>Riepilogo<\/h2>\n<p>The right microduct connector matches both the duct interface and the task at the joint. Measure OD and ID, confirm the route and environmental duty, then distinguish a joining connector from an end closure, cable seal or protective cover. At building entries, identify every leakage path and obtain the documented arrangement for the actual cable-and-duct combination. Follow the selected installation and test method rather than compensating for a poor fit with improvised materials. Treat recovered components according to the manufacturer&#8217;s reuse policy and retain an inspection history. Oulu&#8217;s connector options can then be compared with the written project requirements, using the exact configuration and current product documentation before ordering.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>Scopri come scegliere un connettore per microcondotti in base alle dimensioni del condotto, alla tenuta richiesta, all\u2019ambiente di posa, al metodo di installazione e all\u2019accesso per la manutenzione.<\/p>","protected":false},"author":2,"featured_media":5271,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-4098","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-insights"],"_links":{"self":[{"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/posts\/4098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/comments?post=4098"}],"version-history":[{"count":5,"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/posts\/4098\/revisions"}],"predecessor-version":[{"id":5071,"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/posts\/4098\/revisions\/5071"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/media\/5271"}],"wp:attachment":[{"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/media?parent=4098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/categories?post=4098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microductconnector.com\/it\/wp-json\/wp\/v2\/tags?post=4098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}